EDM Toolbox Now BAFA-Eligible: How the Grant Works

The EDM Toolbox is now in the BAFA register of subsidised energy management software. What it means for acquisition cost — and how the application works.

EDM Toolbox in the BAFA software register

Since the latest update of the BAFA software list, the EDM Toolbox is now included in the official [register of subsidised energy management software](https://www.bafa.de/DE/Energie/Energieeffizienz/Energieeffizienz_und_Prozesswaerme/Modul3_Energiemanagementsysteme/ems_liste_foerderfaehige_software.html). For companies operating in Germany that means: acquisition costs are eligible for grants under the *Federal Funding for Energy and Resource Efficiency in Industry* (EEW) programme — specifically under Module 3.

Inclusion in the register is not automatic. BAFA reviews each product against the funding directive of 25 January 2024 and checks whether the software fully supports the implementation, maintenance and improvement of an energy management system according to *DIN EN ISO 50001*. Technical conformity has to be confirmed by a certificate from a conformity assessment body accredited under *ISO/IEC 17065*. The EDM Toolbox meets these requirements.

> In practical terms: companies currently setting up or refreshing an EnMS in Germany can co-finance the software cost through EEW funding — instead of covering it entirely from operating budgets.

Module 3: what is funded

Module 3 of the EEW directive bundles three technically related areas under one roof. All three can be combined in a single application and are treated as one implementation package.

| Area | Examples |

|---|---|

| **Measurement, control and regulation technology (MCR)** | Data loggers, PLCs, gateways, communication infrastructure |

| **Sensor technology** | Electricity, gas, heat, water meters; temperature, pressure, flow sensors |

| **Energy management software** | Platforms for data capture, evaluation and ISO-50001-aligned reporting |

Important to know: generic office tools or off-the-shelf BI platforms are not eligible. The software has to support the closed loop of an EnMS (objective setting, data capture, evaluation, action) systematically, and it must hold a valid certificate. That is precisely why the BAFA software register exists — it gives applicants legal certainty about eligibility upfront.

Who can apply

Eligible applicants include commercial businesses with a registered office or operating site in Germany — whether or not they meet the EU SME definition. Municipal companies and contractors can also apply, provided they carry out and finance the investment themselves.

Two topics are worth checking before submission:

The actual grant rate depends on company size, location and the combination of modules chosen. Current subsidy rates and bonuses are published in the applicable BAFA information sheet — always review the most recent version for each new application, as parameters can change during the lifetime of the directive.

How large is the grant?

Module 3 of the EEW directive works with a base grant rate plus surcharges. As a rough guide — the exact values are set by the applicable BAFA information sheet:

| Applicant | Base grant rate | Example on 20,000 € eligible spend |

|---|---|---|

| Large enterprises (non-SME) | approx. **30 %** | approx. 6,000 € grant |

| Medium-sized enterprises (SME) | approx. **40 %** | approx. 8,000 € grant |

| Small enterprises | up to **50 %** | up to 10,000 € grant |

Additional project-specific bonuses can apply — for example when the project is embedded in a transformation plan or when the site is particularly energy-intensive. Important: grant rates and cumulation rules can change during the lifetime of the directive. Reviewing the current BAFA information sheet should therefore be the first step before every application.

Eligible costs include the acquisition and roll-out of the EDM Toolbox: setup, data integration and user training. Ongoing licence or operational costs after the funded implementation period are typically no longer part of the grant.

How to apply for the grant with the EDM Toolbox

The following five steps summarise the typical path — tailored to the EDM Toolbox as eligible software.

1. **Request a quote and product evidence.** Reach out to LineMetrics at *edm-toolbox@linemetrics.com* and ask for a tailored quote including the BAFA product evidence. We provide the ISO/IEC 17065 conformity confirmation and the reference to the BAFA software register entry — both are required for the application review.

2. **Assemble the application package.** In addition to the quote you will need a short concept: EnMS objectives, scope of metering points, planned evaluations and roles. If you already hold an ISO 50001 certificate, attach it to the application — this speeds up the review noticeably.

3. **Submit the application via ELAN-K2 — before starting the project.** The electronic application goes through the BAFA *ELAN-K2* portal. Until approval, no binding order or contract may be placed. LineMetrics provides a non-binding quote for this waiting period that meets the approval condition.

4. **Wait for the approval notice and roll out the software.** After the written approval notice you can place the binding EDM Toolbox order and start implementation — including onboarding, data integration and connection of your metering points. LineMetrics documents the implementation so that the receipts can later feed directly into the proof of use.

5. **Submit the proof of use.** After completion, file the proof of use within the stipulated deadline. On request, LineMetrics provides a structured receipt overview and the configuration documentation of your EDM Toolbox — both make the final BAFA review substantially easier.

Practical hints for the application

Communication with BAFA runs through Referat 513 in Eschborn. Processing times and query cycles vary with application volume. Two things from the field that save time:

How the EDM Toolbox fits the funding logic

The EDM Toolbox has been built from the ground up along the requirements of an *ISO-50001-compliant* energy management system. This covers full metering-point and consumption-data coverage, substitute value handling per recognised methods (ÖNORM B 8135, VDI 3807), calculation of EnPIs and baselines, and an audit-proof trail for every reading. Exactly this process coverage is why the software was accepted into the BAFA register.

For applicants this means practically: the software delivers not only the required technical foundation, but also the reporting structure that later enables a clean proof-of-use file.

Conclusion

Being added to the BAFA register opens a structured way for companies in Germany to co-finance the software portion of an ISO-50001 programme through Module 3 of the EEW funding. The application process is formalised, follows fixed rules and rewards careful preparation. Anyone planning an EnMS rollout should evaluate whether the software procurement can be combined with a Module 3 application — the framework is currently in place.

All articles